Wide environmental shot of a detached ADU mid-frame construction in a residential backyard, Pacific Southwest setting, exposed wood framing structure rising from a poured concrete foundation, natural overcast daylight, no crew visible, focus on the structural skeleton and site conditions
Wide environmental shot of a detached ADU mid-frame construction in a residential backyard, Pacific Southwest setting, exposed wood framing structure rising from a poured concrete foundation, natural overcast daylight, no crew visible, focus on the structural skeleton and site conditions
— Accessory Dwelling Units

Built to code. Built to last. No handoffs.

Trinity carries your ADU from permit filing through foundation, framing, and utility connections — one crew, one schedule, one point of contact.

Close-up environmental shot of rebar grid laid in an ADU foundation excavation, aggregate and compacted soil visible at edges, natural overcast daylight illuminating the steel mesh pattern, wide framing showing the full footprint of the foundation form
Close-up environmental shot of rebar grid laid in an ADU foundation excavation, aggregate and compacted soil visible at edges, natural overcast daylight illuminating the steel mesh pattern, wide framing showing the full footprint of the foundation form
/ Structural First Principles

This is a 40-year structure, not a shed

Every ADU Trinity builds carries dedicated plumbing, utility connections, and a poured foundation engineered to code — the same structural standards as the primary residence.

We own the concrete and framing trades in-house. That means the foundation crew and the framing crew are the same company — no markup layers, no version mismatches.

• Foundation to Finish

One scope. One schedule. Four phases.

01 — Site Visit

02 — Permit & Utilities

03 — Foundation & Frame

04 — Close & Inspect

Trinity files permits and coordinates utility connections directly — no separate permit expediter, no third-party utility contractor.

We walk every inspection with the building department, resolve punch-list items on-site, and hand you a permitted, livable unit.

We assess the lot, review zoning rules, and confirm setbacks before any drawing gets made. The site tells us what's possible.

Our in-house concrete crew pours the foundation; our framing crew follows on the same schedule — no gap, no re-mobilization cost.

Ready to talk site conditions and scope?

On-site estimates let us give you a real number — not a range pulled from a spreadsheet. Bring the lot, the zoning letter, the questions.